Plain-language guide to the energy-efficiency chapter of the North Carolina Residential Code - what it requires today, what "frozen until 2031" actually means, and how REScheck and Manual J fit in. Every claim on this page is checked against primary sources - see the Verification Appendix.
Last verified September 20, 2026 against the sources linked above. Change log
We confirm the jobsite, report path and scope before any invoice.
Request a quoteStandard delivery target: 2 business days after complete inputs and confirmed scope. Rush and every size tier.
Tell us the jurisdiction. The code edition and climate zone are matched to what your building department enforces, not a national default.
The energy-efficiency requirements for a new North Carolina house live in Chapter 11 ("[RE] Energy Efficiency") of the 2018 North Carolina Residential Code (NCRC), which is based on the 2015 International Energy Conservation Code (IECC) with North Carolina-specific amendments layered on top. It became effective January 1, 2019, and - despite the code year in its name - it remains the current, enforceable residential energy code in North Carolina as of this writing.1
The chapter itself explains its own lineage in a note at the top of Section N1101: its text "is extracted from the 2018 edition of the North Carolina Energy Conservation Code - Residential Provisions," with section numbers cross-referenced back to that source document.2 In practice this means North Carolina keeps its residential energy rules in two places that say the same thing - the standalone NC Energy Conservation Code and Chapter 11 of the NC Residential Code - so a plan reviewer may cite either one.
Who enforces it: The North Carolina Building Code Council, overseen administratively by the Office of State Fire Marshal (OSFM) within the Department of Insurance, is the body that adopts and amends the state building code. Individual permits are reviewed and inspected locally, by the building inspection department in the county or municipality where you're building - not by a single statewide office.3
Who it affects: Anyone pulling a residential building permit for a one- or two-family dwelling or townhouse in North Carolina. Detached and attached garages on the same lot as a dwelling are specifically exempted from the energy chapter by statute.4
Why the code year looks stale - the 2031 freeze: In 2023, the General Assembly passed House Bill 488 (Session Law 2023-108) over the governor's veto. Among other things, it reorganized the Building Code Council, created a new Residential Code Council to handle one- and two-family residential codes separately from commercial codes, and reset the comprehensive-revision clock for the Residential Code. The statute that resulted, G.S. 143-138, now reads:
"...the Residential Code Council shall perform a comprehensive review and revise or amend the North Carolina State Building Code: Residential Code for One- and Two-Family Dwellings...only every six years, to become effective the first day of January of the following year, with at least six months between adoption and effective date. The first six-year revision by the Residential Council under this subsection shall be adopted to become effective January 1, 2031, and every six years thereafter."5
In plain terms: the next comprehensive update to the North Carolina Residential Code - including Chapter 11's energy provisions - isn't scheduled to take effect until January 1, 2031. Multiple outlets covering the bill described it as effectively freezing the state's residential, energy, plumbing, and mechanical codes at their 2018 baseline for roughly eight years.6
What the freeze does not mean: it doesn't roll back to an older code, and it doesn't necessarily forbid every narrow rule change in the interim - the same legislation that created the freeze also directly ordered a couple of targeted amendments (for example, a required optional insulation alternative for unvented attics). What it does mean is that no ground-up revision to the prescriptive tables, blower-door threshold, or duct-leakage limits is expected before 2031 absent further legislative action.6
A split-cycle wrinkle worth knowing about: the freeze applies to the residential code. North Carolina's commercial and multifamily building code kept moving on its normal cycle - a 2024 edition (based on the 2021 I-Codes) was adopted, though its effective date has itself been delayed more than once while the new Residential Code Council was being seated.7 None of that affects one- and two-family residential permits, which is the focus of this page.
North Carolina spans three IECC climate zones, assigned by county in Table N1101.7 (parallel to national Table R301.1):8
| Zone | General area | Representative counties |
|---|---|---|
| 3A (warm-humid) | Coastal plain and southern border counties | Mecklenburg, Cumberland, New Hanover*, Onslow*, Brunswick*, Craven, Wayne, Robeson, Union, Wilson, Beaufort, Duplin |
| 4A (mixed-humid) | Most of the Piedmont and western mountains | Wake, Durham, Guilford, Forsyth, Buncombe, Catawba, Iredell, Henderson, Haywood, Orange |
| 5A (cold-humid) | Six high-elevation northwestern counties | Alleghany, Ashe, Avery, Mitchell, Watauga, Yancey |
Asterisked counties in the source table are additionally flagged "warm-humid," which affects whether basement-wall insulation is required.8 This is a representative sample, not the full 100-county list - confirm your specific county directly against Table N1101.7 before finalizing a design, since a handful of counties in the Charlotte metro area (including Mecklenburg, Cabarrus, and Gaston) fall in 3A rather than 4A despite sitting in the central Piedmont.
The core prescriptive path requires every building thermal envelope component to meet or beat the R-value, U-factor, and SHGC values in Table N1102.1.2 for your climate zone:9
| Component | Zone 3 | Zone 4 | Zone 5 |
|---|---|---|---|
| Fenestration U-factor (max) | 0.35 | 0.35 | 0.35 |
| Skylight U-factor (max) | 0.55 | 0.55 | 0.55 |
| Glazed fenestration SHGC (max) | 0.30 | 0.30 | NR (not required) |
| Ceiling R-value (min) | 38, or 30 with continuous insulation | 38, or 30 with continuous insulation | 38, or 30 with continuous insulation |
| Wood-frame wall R-value (min) | 15, or 13+2.5 continuous | 15, or 13+2.5 continuous | 19, or 13+5 continuous, or 15+3 continuous |
| Floor R-value (min) | 19 | 19 | 30 |
| Basement wall R-value | 5/13 | 10/15 | 10/15 |
| Slab R-value & depth | 0 | 10, 2 ft | 10, 2 ft |
| Crawlspace wall R-value | 5/13 | 10/15 | 10/19 |
Notation: "13+5" means R-13 cavity insulation plus R-5 continuous insulation; for basement/crawlspace walls, the two numbers separated by "/" represent continuous vs. cavity insulation options. Basement-wall insulation is not required at all in the warm-humid counties flagged in Table N1101.7.9
Section N1102.1.4 gives an all-U-factor version of the same table for anyone whose documentation is already in U-factor terms rather than R-value terms - useful for REScheck-style calculations and steel-frame assemblies.10 Section N1102.1.5, the Total UA Alternative, is North Carolina's version of a whole-envelope trade-off: if the total heat loss (UA, the sum of U-factor times assembly area) of the actual proposed envelope is less than or equal to what the U-factor table would produce for the same assembly areas, the building is considered compliant even if an individual component - say, an undersized wall - misses its own table value.10 The UA calculation must be done consistent with ASHRAE's Handbook of Fundamentals and must separately confirm SHGC compliance; a weak wall can't be offset by ignoring window solar gain.
North Carolina requires the building thermal envelope to be sealed per a specific checklist (band-joist blocking, shaft/chase sealing, HVAC boot sealing, house-wrap or sheathing-joint sealing, and more), and gives two ways to demonstrate the result: a visual inspection option (a builder- or design-professional-certified checklist, no testing equipment required) or a testing option.11
Under the testing option, the building passes if tested air leakage is at or below one of two equivalent thresholds:
Testing must occur after rough-in and after envelope penetrations are installed, using a blower door certified to ASTM E779 or ASTM E1827, and may be performed and reported by the permit holder, a North Carolina-licensed general contractor, a North Carolina-licensed HVAC contractor, a North Carolina-licensed home inspector, a registered design professional, a certified BPI envelope professional, or a certified HERS rater.11
Why 5 ACH50 stands out: the current national IECC framework (in place since the 2012 edition and carried through the 2015, 2018, and 2021 editions) tightens the default blower-door threshold to 3 ACH50 for Climate Zones 3 through 8 unless a state amends it. North Carolina's amended text keeps the looser 5 ACH50 (or equivalent 0.30 CFM50/sq. ft.) figure across Zones 3, 4, and 5 rather than adopting that tighter national number - a real, state-specific loosening, not an oversight in secondary reporting. Independent building-science and HERS-rater sources describe the same 5.0 ACH50 pass/fail line for North Carolina new construction.12
Ducts, air handlers, and building cavities used as ducts must be sealed, and duct leakage must be verified by one of two test methods:13
Three exceptions matter for planning a job: duct systems (or portions) located entirely inside the building thermal envelope are not required to be leak-tested; installing a partial system as part of a replacement, renovation, or addition doesn't trigger a duct-leakage test; and complete duct systems serving 750 square feet or less don't need to be tested at all.13 Duct testing may be performed and reported by the same list of qualified parties as blower-door testing (permit holder, NC-licensed GC, NC-licensed HVAC contractor, NC-licensed home inspector, registered design professional, certified BPI envelope professional, or certified HERS rater).
Section N1103.6 requires ventilation meeting Section M1507 of the code or the International Mechanical Code, with automatic or gravity dampers on outdoor air intakes and exhausts that close when the ventilation system isn't running.14
Section N1103.7 is the section that ties this whole page together with the reports this site prepares: "Heating and cooling equipment shall be sized in accordance with ACCA Manual S based on building loads calculated in accordance with ACCA Manual J or other approved heating and cooling calculation methodologies."14 This isn't a suggestion or a best practice pulled from an industry group - it's a mandatory code requirement, in the same chapter as the insulation table, the blower-door threshold, and the duct-leakage limits. Equipment also has to meet the federal minimum efficiency rating for its installed location.
Not less than 75 percent of the lamps in permanently installed fixtures must be high-efficacy lamps, or not less than 75 percent of permanently installed fixtures must contain only high-efficacy lamps - low-voltage lighting is exempt.15
Section N1101.13 lists exactly four routes to a compliant home, and North Carolina adds a fifth in practice by explicitly naming REScheck as an accepted tool:16
| Path | Code section | What it is | Best fit |
|---|---|---|---|
| Prescriptive | N1101.13(1); N1102-N1104 | Meet every line in the R-value/U-factor table for your climate zone, plus the mandatory air-sealing, duct, ventilation, and equipment-sizing items. | Standard framing, simple massing, no unusual glazing. |
| Total UA / U-factor trade-off | N1102.1.4 & N1102.1.5 | Total envelope heat loss (UA) must be at or below what the U-factor table would produce for the same areas; SHGC must still independently comply. | 2x4 walls, larger glazing packages, or one weak component offset by stronger performance elsewhere. |
| Simulated performance | N1105 | Whole-building energy model comparing the proposed design's annual energy cost (or source energy) against a standard reference design built to the same table. | Custom homes, non-standard HVAC, or projects already building an energy model for a certification program. |
| Energy Rating Index (ERI/HERS) | N1106 | A HERS rater or registered design professional scores the home on the 0-100 ERI scale using RESNET ICC Standard 301-2014, while also meeting the mandatory items in N1101 through N1104. | Homes already getting a HERS rating for a rebate, tax credit, or green-building certification. |
| REScheck | N1101.13(4) | Explicitly permitted as a stand-alone compliance path. The section names a North Carolina-specific REScheck; OSFM's interpretation of the same section says one was never built for the 2018 code and points to the 2015 IECC (Residential) setting instead.19 | Fast, low-cost documentation for prescriptive-adjacent designs; the fastest path through most plan reviews. |
ERI targets, verified: Table N1106.4.1 (without on-site renewable energy) sets a maximum ERI of 47 for Zone 3, 50 for Zone 4, and 51 for Zone 5, effective January 1, 2023 and forward (the table also lists slightly looser 2019-2022 transition values of 51/54/55). Table N1106.4.2 sets corresponding maximums with on-site renewable energy credited: 61/63/63 for Zones 3/4/5 respectively.16 A home scoring at or below its zone's target - while also meeting the mandatory items - complies via the ERI path regardless of whether every individual envelope component hits the prescriptive table.
North Carolina's own code text doesn't just bless REScheck and move on - it attaches two specific restrictions directly in Section N1101.13(4): "Envelope requirements may not be traded off against the use of high efficiency heating or cooling equipment. No tradeoff calculations are needed for required termite inspection and treatment gaps."16 The first restriction matters because a national default REScheck run will sometimes let a strong HVAC efficiency number offset a weak envelope number - North Carolina's amendment blocks that particular trade for compliance purposes. The second restriction is a convenience: North Carolina's termite-gap allowances (Table N1102.2.11) don't need to be modeled as an energy penalty in the software, because the code already accounts for them separately.
Because North Carolina's insulation table is set at 2015 IECC levels and hasn't moved since 2019, most standard production and semi-custom homes clear the prescriptive table without much drama - the REScheck trade-off tends to earn its cost on 2x4-wall designs and larger-glazing custom homes rather than on typical spec construction.
The freeze is real, but it isn't total. House Bill 488's restructuring pushed the next comprehensive Residential Code revision to January 1, 2031 and created the Residential Code Council to run that process separately from commercial codes.5 As of the most recent OSFM update available, the Office of State Fire Marshal could not yet confirm when the Residential Code Council would be fully constituted, since appointment is controlled by the Governor and General Assembly, not OSFM.17 That uncertainty is about the council's makeup and process, not about which code applies to your permit today - the 2018 NCRC Chapter 11 is the operative rule right now, and there is no pending replacement edition working through the pipeline for residential energy provisions the way there is in states on a normal three-year cycle.
Commercial moved; residential didn't. The 2024 North Carolina Building Code (commercial and multifamily, based on the 2021 I-Codes) was adopted on its own separate track and has had its effective date pushed more than once, most recently pending the Residential Code Council's formation under Session Law 2025-2.18 If you do both commercial and residential work in North Carolina, don't assume a single code year applies across both - they're on genuinely different cycles now, a structural change from before HB 488.
North Carolina's blower-door number is looser than the national default, on purpose. As detailed in Section 2, the code's testing option accepts 5 ACH50 (or 0.30 CFM50/sq. ft.) statewide across Zones 3, 4, and 5 - not the 3 ACH50 that the unamended national IECC framework has applied to those zones since the 2012 cycle. This is a state amendment, not an error in outside coverage; confirm it directly against N1102.4.2.2 if a national-audience article tells you otherwise.11
The "North Carolina specific REScheck" named in the code does not exist. Section N1101.13(4) permits it, and OSFM's January 2020 interpretation of that same section answers the obvious follow-up: "There will not be a NC-Specific ResCheck for the 2018 NC energy code," and the old 2012 NC tab became invalid when the 2018 code took effect. OSFM's stated alternate is the 2015 IECC (Residential) setting for the envelope values, with the 2018 NC installation standards - air sealing, duct performance - followed on top; some 2015 IECC lines are tighter than North Carolina's own minimums, and the reviewer still needs a pass under the setting you ran.19 The code's two restrictions still bind either way: no HVAC-efficiency tradeoff against the envelope, and no termite-gap tradeoff calculation. A run left on generic national defaults won't reflect either one.
Small duct systems and in-envelope ducts get a real break. The 750-square-foot system exemption and the entirely-inside-the-envelope exemption both remove the duct-leakage test requirement outright, which matters for additions, accessory dwelling units, and homes designed with mechanical closets and chases kept inside conditioned space.13
Garages are outside the energy chapter entirely. By direct statutory exception (N.C.G.S. 143-138(b19)), no energy conservation code provision applies to detached or attached garages on the same lot as a dwelling - don't spend Manual J or REScheck effort modeling garage envelope performance unless the space is being converted to conditioned living space.4
Manual J and Manual S sizing is a mandatory code item, not an optional best practice. Section N1103.7 requires ACCA Manual J-based load calculations and ACCA Manual S-based equipment sizing for every project subject to this chapter - a plan reviewer can legitimately hold up a permit over missing or clearly wrong load documentation, independent of which envelope compliance path you choose.14
What to ask your local building department before you finalize a compliance strategy:
Is North Carolina still using the 2018 energy code, or has it been updated? It's still the 2018 North Carolina Residential Code, Chapter 11 (based on the 2015 IECC with North Carolina amendments), effective January 1, 2019.1 House Bill 488 (2023) reorganized the state's code-adoption process and pushed the next full residential code revision out to January 1, 2031, so this edition remains the current one for permits filed today.5
Do I need a blower-door test in North Carolina, and what number do I need to hit? Yes. The testing option requires a result at or below 5 air changes per hour at 50 Pascals (5 ACH50), or alternatively 0.30 CFM50 per square foot of building thermal envelope surface area.11 A visual-inspection compliance path also exists as an alternative to testing, documented on a builder-certified checklist.
Can I use REScheck to show compliance in North Carolina? Yes. Section N1101.13(4) names a "North Carolina specific REScheck keyed to the 2018 IECC",16 but OSFM's interpretation of that section states one will not exist for the 2018 code and that the 2015 IECC (Residential) setting may be used for the envelope values, with the 2018 NC installation standards followed on top.19 The two restrictions in the code text still apply: no tradeoff of envelope requirements against high-efficiency heating or cooling equipment, and no tradeoff calculation for required termite inspection and treatment gaps.
Does North Carolina require the REScheck .rck file with my permit? No. Neither the code text nor the OSFM interpretation requires a project file to be submitted - a reviewer checks the signed compliance certificate and whether its inputs match the drawings.19 A department can still ask for the project file, and the current web version saves one as a .rxl file; .rck is the extension of the retired desktop version, which DOE supports only through the 2015 IECC.20 We include the project file with any North Carolina report on request.
Which climate zone is my North Carolina county in, and why does it matter? North Carolina spans three IECC climate zones: 3A across the southern and coastal counties, 4A across most of the Piedmont and mountains, and 5A in six high-elevation counties (Alleghany, Ashe, Avery, Mitchell, Watauga, and Yancey).8 Your zone sets which insulation and fenestration table row applies, and it's a direct input to a correctly run Manual J load calculation.
Will the frozen North Carolina code change before 2031? The statute sets the next comprehensive revision of the North Carolina Residential Code, including its energy chapter, to take effect January 1, 2031.5 Narrow, targeted rule changes outside a full revision remain legally possible during the freeze - the same 2023 legislation ordered at least one such change - so always confirm current requirements with your local building department rather than assuming nothing can change before then.
Who prepares the Manual J and REScheck reports? Travis Smith, The Plans Examiner. He holds the same certification your building department's plan reviewer holds; the specifics are at the end of this page.
Need a REScheck report? North Carolina's own code carves out real restrictions on how REScheck can be used here - no HVAC-efficiency tradeoff against the envelope - and the NC-specific version the code names was never built, so the setting you run matters. A REScheck report ($149) prepared with those restrictions applied from the start, with the project file included on request, avoids a round-trip through plan review.
Travis Smith, ICC-Certified Residential Plans Examiner. The same certification your building department's plan reviewer holds - working for you.
Need a Manual J load calculation? Section N1103.7 makes ACCA Manual J-based load calculations and Manual S-based equipment sizing mandatory for every project under this chapter - not optional, and not something a generic square-footage rule of thumb satisfies. A Manual J report ($249), calculated room-by-room per IRC M1401.3, gives your HVAC contractor and code official equipment sizing they can both stand behind.
Ordering both? The Manual J + REScheck package ($349) covers both required documents from one plan set, at less than ordering each separately.
Building somewhere other than North Carolina? See the full state guides index for other states' requirements.
Already been rejected? If your jurisdiction has already sent the report back, we work from the correction notice itself - see REScheck correction and resubmittal or Manual J correction and resubmittal.
Claims below were checked directly against the North Carolina Residential Code's own adopted text (via ICC Digital Codes / UpCodes, which mirror the state-adopted code verbatim), the U.S. Department of Energy's state code tracker, North Carolina session law and statute text, and the NC Office of State Fire Marshal - not secondary blog summaries.
Current residential energy code edition and effective date (2018 NCRC Ch. 11 / 2015 IECC basis, effective 1/1/2019). VERIFIED. Confirmed against the DOE Building Energy Codes Program state profile for North Carolina and the NC OSFM "Codes - Current and Past" page, both of which list the 2018 Residential Code as currently effective with no newer residential edition adopted.1
2031 freeze on the next comprehensive Residential Code revision. VERIFIED. Confirmed against the actual statutory text of G.S. 143-138 as amended by Session Law 2023-108 (House Bill 488), which sets the first six-year revision by the Residential Code Council to become effective January 1, 2031.5
Climate zone assignments by county (Table N1101.7). VERIFIED. Cross-checked directly against the full table as reproduced by ICC's own hosted preview and the UpCodes mirror of NCRC 2018 Chapter 11 - all zone assignments cited above match the primary table exactly.8
Blower-door thresholds (5 ACH50 / 0.30 CFM50 per sq. ft.). VERIFIED. Quoted directly from Section N1102.4.2.2 of the adopted code text; corroborated by an independent HERS-industry source describing the same 5.0 ACH50 pass/fail line for new North Carolina construction.11
Duct-leakage thresholds and exemptions (5/4 CFM25 per 100 sq. ft.; in-envelope and ≤750 sq. ft. exemptions). VERIFIED. Quoted directly from Sections N1103.3.3, N1103.3.3.1, and N1103.3.3.2 of the adopted code text.13
Mandatory ACCA Manual J / Manual S equipment sizing (Section N1103.7). VERIFIED. Quoted directly from the adopted code text.14
REScheck-specific restrictions (no HVAC tradeoff; no termite-gap tradeoff needed). VERIFIED. Quoted directly from Section N1101.13(4) of the adopted code text.16
ERI target tables (Tables N1106.4.1 and N1106.4.2). VERIFIED. Quoted directly from the adopted code text, including the 2019-2022 transition values and the 2023-forward values.16
Current status and exact seating/timeline of the new Residential Code Council. UNVERIFIED - explicitly open per the primary source itself. The NC OSFM's own public letter states it cannot predict when the Residential Code Council will be fully constituted, since that appointment process is controlled by the Governor and General Assembly. This page does not claim a specific current membership or completion date for that council.17
Whether any additional narrow interim rule amendments to Chapter 11 exist beyond the unvented-attic insulation alternative and the now-expired temporary duct-insulation rule found in this research pass. UNVERIFIED. This page describes the freeze as covering comprehensive revision, not every conceivable rule change, but did not attempt to exhaustively enumerate every interim amendment adopted since 2019. Confirm with your local building department whether any jurisdiction-specific interim rule affects your project.
This page summarizes North Carolina's adopted 2018 Residential Code, Chapter 11, for general guidance. Code requirements vary by specific project and by interpretation of your local plan reviewer. Always confirm current requirements with your building official before finalizing design or bidding.
U.S. Department of Energy, Building Energy Codes Program, State Profile - North Carolina (energycodes.gov/status/states/north-carolina): "Current State Code (Residential) = 2015 IECC with amendments; Effective Date = 01/01/2019; Can use COM/REScheck = Yes." Corroborated by NC Office of State Fire Marshal, "Codes - Current and Past" (ncosfm.gov/codes/codes-current-and-past): "The 2018 Residential Code was effective from January 1, 2019 and is currently effective." ↩↩↩
2018 North Carolina Residential Code, Section N1101.1, introductory note (ICC Digital Codes / UpCodes mirror, codes.iccsafe.org/content/NCRC2018/chapter-11-re-energy-efficiency). ↩
NC Office of State Fire Marshal, "Codes - Current and Past" (ncosfm.gov/codes/codes-current-and-past), describing OSFM's administrative role and local building-department enforcement. ↩
2018 North Carolina Residential Code, Section N1101.1, Exception 1, citing N.C.G.S. 143-138(b19) (ICC Digital Codes / UpCodes mirror). ↩
VERIFIED (primary source): N.C. General Statutes § 143-138, official text via the North Carolina General Assembly (ncleg.net/enactedlegislation/statutes/html/bysection/chapter_143/gs_143-138.html), as amended by Session Law 2023-108 (House Bill 488), setting the first six-year Residential Code Council revision to become effective January 1, 2031. Session Law 2023-108 full text via Vote Smart mirror (static.votesmart.org/static/billtext/94900.pdf). ↩↩↩↩↩
E2 (Environmental Entrepreneurs), "'Eight Years of Stagnation' for North Carolina Building Codes" (e2.org); Natural Resources Defense Council, "General Assembly Overrides Governor Cooper's Veto on House Bill 488" (nrdc.org); WRAL, "Some concerned building code freeze could leave new builds in NC decades out of date," describing the veto override and the scope of the freeze; corroborated against the primary statute text in footnote 5. ↩
Apartment Association of Western North Carolina, "Legislative Update: SB 166: 2024 Building Code Regulatory Reform" (aawnc.org); NC OSFM, "Letter re 2024 State Building Code Effective Date" (ncosfm.gov/letter-re-2024-state-building-code-effective-date); ICC-NTA, "Update Regarding the Effective Date of the 2024 North Carolina State Building [Code]" (icc-nta.org), describing Session Law 2025-2's further delay of the 2024 commercial/multifamily code pending Residential Code Council formation. ↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Table N1101.7 (R301.1), full county-by-zone list, cross-checked identically against ICC Digital Codes (codes.iccsafe.org/content/NCRC2018/chapter-11-re-energy-efficiency) and the UpCodes mirror (up.codes/viewer/north_carolina/irc-2015/chapter/11/re-energy-efficiency). ↩↩↩↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Table N1102.1.2 (R402.1.2), "Insulation and Fenestration Requirements by Component," full table and footnotes, via UpCodes mirror of the adopted NCRC 2018 text. ↩↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Sections N1102.1.4 (R402.1.4) "U-factor Alternative" and N1102.1.5 (R402.1.5) "Total UA Alternative," via UpCodes mirror of the adopted NCRC 2018 text. ↩↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Section N1102.4.2.2 "Testing Option," via UpCodes mirror of the adopted NCRC 2018 text, setting 0.30 CFM50/SFSA or 5 ACH50 as the two equivalent pass criteria. ↩↩↩↩
Peak Energy Inc., "Blower Door Test Results: ACH50 in NC" (peakenergync.com/blog/blower-door-test-results-explained-nc), an independent HERS-industry source stating "5.0 ACH50 or less passes the 2018 NC Energy Conservation Code" for new construction, corroborating the primary code text in footnote 11. National IECC blower-door framework (3 ACH50 in Zones 3-8 since the 2012 cycle) per general building-energy-code industry references (natethehousewhisperer.com, "What IECC Energy Code Is Your State On?"). ↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Section N1103.3.3 "Duct Leakage (Prescriptive) and Duct Testing (Mandatory)," including subsections N1103.3.3.1, N1103.3.3.2, and the three testing exceptions, via UpCodes mirror of the adopted NCRC 2018 text. ↩↩↩↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Sections N1103.6 "Mechanical Ventilation (Mandatory)" and N1103.7 "Equipment Sizing and Efficiency Rating (Mandatory)," via UpCodes mirror of the adopted NCRC 2018 text. ↩↩↩
2018 North Carolina Residential Code, Section N1104.1 "Lighting Equipment (Mandatory)," via UpCodes mirror of the adopted NCRC 2018 text. ↩
VERIFIED (primary source): 2018 North Carolina Residential Code, Section N1101.13 "Compliance," listing the four compliance routes plus the REScheck provision with its two restrictions; Section N1106.4 "ERI-Based Compliance" with Tables N1106.4.1 and N1106.4.2, via UpCodes mirror of the adopted NCRC 2018 text. ↩↩↩↩↩↩
VERIFIED (primary source), and the basis for the UNVERIFIED item in the Appendix above: NC Office of State Fire Marshal, "Letter re 2024 State Building Code Effective Date" (ncosfm.gov/letter-re-2024-state-building-code-effective-date/open): "OSFM does not, however, have any influence over the appointment and confirmation of members to the Residential Code Council - that process is controlled by the Governor and the General Assembly. Accordingly, OSFM cannot predict when the Residential Code Council will be fully constituted." ↩↩
ICC-NTA, "North Carolina Office of State Fire Marshal Issues Statement on Building Code Effective Date" (icc-nta.org), describing Session Law 2024-57 and Session Law 2025-2's successive delays of the 2024 North Carolina State Building Code's effective date; up.codes, "North Carolina Building Codes" landing page, noting the 2024 code's effective date "has been postponed indefinitely." ↩
VERIFIED (primary source): NC Department of Insurance, Office of State Fire Marshal - Engineering Division, code interpretation "Options for Residential Building Energy Code Compliance," Sections R401.2 and N1101.13, dated January 13, 2020 (ncosfm.gov): "There will not be a NC-Specific ResCheck for the 2018 NC energy code, and with the adoption of the 2018 NC Energy Code, the 2012 NC Energy Code tab in ResCheck became an invalid option," and "they can use the 2015 IECC (Residential) ResCheck for the building envelope values, and then follow the installation standards in the 2018 NC Energy code, such as the required air sealing and duct performance measures," with the caution that "there are some elements of the 2015 IECC that are more stringent than the 2018 NC Energy Code." Corroborated by the REScheck-Web energy-code list read September 20, 2026, which offers the IECC editions plus New York, Vermont, Illinois, Massachusetts, Chicago, Denver, Louisiana, the District of Columbia, Puerto Rico and Utah 2012 - and no North Carolina edition. ↩↩↩↩
VERIFIED: REScheck-Web saves a project to disk as a .rxl file (project download, read September 20, 2026); .rck is the file extension of REScheck Desktop, which per DOE "only supports compliance through the 2015 IECC" with 2018 and later editions available in REScheck-Web only (energycodes.gov/rescheck, read September 20, 2026). Neither the North Carolina code text nor the OSFM interpretation in footnote 19 requires either file to be submitted with a permit application. ↩